Back to news
Technology
Horizen Sets November 4 Bridge Cutoff Ahead of L3 Network Wind-Down
(1 day ago) · 1 source · Summarized by CryptoBipto
Horizen has announced a November 4 deadline for holders to bridge their assets before the Layer 3 network is wound down. After this cutoff, the bridge connecting the L3 network will no longer be available, potentially leaving assets stranded for users who do not act in time.
WHY IT MATTERS
When a blockchain network shuts down, users need to move their tokens to a different, active network before the connection between the two is closed.
Read the full analysis with a CryptoBipto membership
Members read why every story matters and the full analysis behind it.
SOURCES
- newsbtc.com
RELATED
ZENBlockchain BridgesNetwork MigrationHorizenLayer 3
